Back to calculator Use calculator
Healthcare IT & ComplianceGenerated accuracy model review: 2026-05-06
EHR Downtime Impact Calculator accuracy and testing
This page documents how Calwarden builds trust for this calculator: source notes, regression-style default tests, limitations, assumptions, unit handling, rounding, and visible change history.
Formula source
- Total impact = downtime staff productivity cost + recovery labor cost + revenue delay impact.
Test cases
Default input regression check
Generated from the checked-in default inputs and calculate function.
Inputs
- Downtime Duration: 4 hr
- Affected Encounters per Hour: 80
- Productivity Loss: 35%
- Loaded Staff Cost: 75 $/hr
- Affected Staff: 45
- Recovery Time per Encounter: 0.2 hr
- Revenue per Encounter: $180
- Revenue Delay Factor: 10%
Expected outputs
- Estimated Downtime Impact: $15,285.00
- Affected Encounters: 320
- Recovery Workload: 64
- Lost Productivity Cost: $4,725.00
Known limitations
- This page documents the checked-in calculator logic and does not certify results for every real-world edge case.
- Use the result as a planning estimate unless the calculator page states a stricter purpose.
Assumptions
- Inputs are user-entered because healthcare policy, prices, retention requirements, and incident facts vary.
- Calculations run locally in your browser and do not store PHI, incident details, access logs, system names, or operating assumptions.
- This calculator does not assess patient safety, clinical triage, or regulatory reporting obligations.
Unit handling
- Downtime Duration accepts values in hr.
- Affected Encounters per Hour accepts numeric values.
- Productivity Loss accepts values in %.
- Loaded Staff Cost accepts values in $/hr.
- Affected Staff accepts numeric values.
- Recovery Time per Encounter accepts values in hr.
- Revenue per Encounter accepts values in $.
- Revenue Delay Factor accepts values in %.
- Estimated Downtime Impact is displayed as currency.
- Lost Productivity Cost is displayed as currency.
Rounding rules
- Number displays use up to 2 decimal places in the calculator UI.
- Currency outputs are displayed with standard US dollar formatting.
- Input precision follows configured step values where provided.
Version history
1.0.0 - 2026-05-06
Generated accuracy and testing page from the current ehr-downtime-impact-calculator calculator definition.
Change log
2026-05-06
Published default regression test documentation and metadata fallbacks for EHR Downtime Impact Calculator.
Calculator transparency
Accuracy pages are generated from checked-in calculator definitions and can be upgraded with curated review metadata over time.