Back to calculator Use calculator
Real Estate InvestorGenerated accuracy model review: 2026-05-06
Rehab Budget Calculator accuracy and testing
This page documents how Calwarden builds trust for this calculator: source notes, regression-style default tests, limitations, assumptions, unit handling, rounding, and visible change history.
Formula source
- Base repair cost = labor + materials + mechanical + exterior + interior. Contingency amount = base repair cost x contingency percent / 100. Soft costs = permits + holding + other. Total rehab budget = base repair cost + contingency amount + soft costs.
Test cases
Default input regression check
Generated from the checked-in default inputs and calculate function.
Inputs
- Labor Cost: $18,000
- Materials Cost: $12,000
- Mechanical Systems: $8,000
- Exterior Repairs: $2,500
- Interior Finishes: $1,500
- Contingency: 12%
- Permits and Fees: $2,500
- Project Holding Costs: $4,000
- Other Costs: $1,500
Expected outputs
- Total Rehab Budget: $55,040.00
- Base Repair Cost: $42,000.00
- Contingency Amount: $5,040.00
- Permits, Holding, and Other: $8,000.00
Known limitations
- This calculator is a planning model only. It does not predict appreciation, market liquidity, lender approval, tax treatment, insurance availability, permit risk, legal obligations, construction defects, tenant behavior, or final sale price.
Assumptions
- All costs, rents, ARV, loans, reserves, fees, and rates are user-entered assumptions.
- Calculations are deterministic and do not fetch market rents, tax rules, insurance quotes, lender terms, or property records.
- Results are estimates only and are not financial, tax, legal, lending, appraisal, inspection, or investment advice.
Unit handling
- Labor Cost accepts values in $.
- Materials Cost accepts values in $.
- Mechanical Systems accepts values in $.
- Exterior Repairs accepts values in $.
- Interior Finishes accepts values in $.
- Contingency accepts values in %.
- Permits and Fees accepts values in $.
- Project Holding Costs accepts values in $.
- Other Costs accepts values in $.
- Total Rehab Budget is displayed as currency.
- Base Repair Cost is displayed as currency.
- Contingency Amount is displayed as currency.
- Permits, Holding, and Other is displayed as currency.
Rounding rules
- Number displays use up to 2 decimal places in the calculator UI.
- Currency outputs are displayed with standard US dollar formatting.
- Input precision follows configured step values where provided.
Version history
1.0.0 - 2026-05-06
Generated accuracy and testing page from the current rehab-budget-calculator calculator definition.
Change log
2026-05-06
Published default regression test documentation and metadata fallbacks for Rehab Budget Calculator.
Calculator transparency
Accuracy pages are generated from checked-in calculator definitions and can be upgraded with curated review metadata over time.