Back to calculator Use calculator
Procurement & VendorsGenerated accuracy model review: 2026-05-06
Vendor Migration Cost Calculator accuracy and testing
This page documents how Calwarden builds trust for this calculator: source notes, regression-style default tests, limitations, assumptions, unit handling, rounding, and visible change history.
Formula source
- Total migration cost = onboarding + exit + internal labor + data migration + third-party services + overlap cost + downtime impact, then adjusted by the entered contingency percent.
Test cases
Default input regression check
Generated from the checked-in default inputs and calculate function.
Inputs
- New Vendor Onboarding: $20,000
- Old Vendor Exit Cost: $8,000
- Internal Migration Hours: 260 hr
- Internal Hourly Cost: 95 $/hr
- Data Migration Cost: $18,000
- Third-Party Services: $6,000
- Parallel Run Period: 2 months
- Old Vendor Monthly Cost: 6,500 $/mo
- New Vendor Monthly Cost: 8,500 $/mo
- Expected Downtime: 4 hr
- Downtime Cost: 3,000 $/hr
- Contingency: 10%
Expected outputs
- Total Migration Cost: $130,570.00
- Internal Labor Cost: $24,700.00
- Overlap Cost: $30,000.00
- Downtime Impact: $12,000.00
Known limitations
- This page documents the checked-in calculator logic and does not certify results for every real-world edge case.
- Use the result as a planning estimate unless the calculator page states a stricter purpose.
Assumptions
- Overlap cost assumes both vendors are paid during the parallel-run period.
- Downtime exposure is included only from the entered hours and hourly impact.
- All prices, fees, rates, and cost drivers are user-entered assumptions.
- Calculations are deterministic and run locally in your browser; Calwarden does not upload or store these inputs.
Unit handling
- New Vendor Onboarding accepts values in $.
- Old Vendor Exit Cost accepts values in $.
- Internal Migration Hours accepts values in hr.
- Internal Hourly Cost accepts values in $/hr.
- Data Migration Cost accepts values in $.
- Third-Party Services accepts values in $.
- Parallel Run Period accepts values in months.
- Old Vendor Monthly Cost accepts values in $/mo.
- New Vendor Monthly Cost accepts values in $/mo.
- Expected Downtime accepts values in hr.
- Downtime Cost accepts values in $/hr.
- Contingency accepts values in %.
- Total Migration Cost is displayed as currency.
- Internal Labor Cost is displayed as currency.
- Overlap Cost is displayed as currency.
- Downtime Impact is displayed as currency.
Rounding rules
- Number displays use up to 2 decimal places in the calculator UI.
- Currency outputs are displayed with standard US dollar formatting.
- Input precision follows configured step values where provided.
Version history
1.0.0 - 2026-05-06
Generated accuracy and testing page from the current vendor-migration-cost-calculator calculator definition.
Change log
2026-05-06
Published default regression test documentation and metadata fallbacks for Vendor Migration Cost Calculator.
Calculator transparency
Accuracy pages are generated from checked-in calculator definitions and can be upgraded with curated review metadata over time.